Language
Language
High-speed maglev · Japan

SCMaglev and the Chuo Shinkansen

Japan's superconducting maglev holds the world rail speed record of 603 km/h. Its first line, Tokyo to Nagoya in about 40 minutes, is under construction and expected to open in 2036 at the earliest.

The system

Levitating 10 centimeters above the guideway

SCMaglev repels instead of attracts, and only floats once it is fast.

SCMaglev was developed by Japanese National Railways and the Railway Technical Research Institute, and is today owned and operated by the Central Japan Railway Company (JR Central). The current train is the L0 series, built by Mitsubishi Heavy Industries, Nippon Sharyo and Hitachi Rail.

It uses electrodynamic suspension. Low-temperature superconducting magnets on the train pass coils in the side walls of a U-shaped guideway and induce currents that lift and center it. The gap is about 10 centimeters, roughly ten times that of the Transrapid, which gives large margins against earthquakes and small guideway imperfections.

The catch: induced levitation needs speed. Below roughly 150 km/h the train rolls on rubber wheels, like an aircraft taking off. Propulsion comes from a linear motor in the guideway walls.

Fact sheet

Operator
Central Japan Railway Company (JR Central)
Train
L0 series
Principle
Electrodynamic suspension (EDS), superconducting magnets
Levitation gap
about 10 cm
World record
603 km/h (21 April 2015, Yamanashi)
Planned service speed
500 km/h
First section
Shinagawa (Tokyo) to Nagoya, 285.6 km, about 86% underground
Travel time
about 40 minutes (today about 90 minutes by Nozomi)
Full route
438 km to Shin-Osaka, about 67 minutes
Cost estimate
11 trillion yen for Shinagawa to Nagoya (October 2025)
Opening
2036 at the earliest
Status
Under construction

Sources: JR Central figures as reported by the sources listed below.

History

Six decades of development

  1. 1964

    Research begins

    After the Tokaido Shinkansen opens, Japanese National Railways turns to maglev research.

  2. 1977

    Miyazaki test track

    Early superconducting vehicles are tested in southern Japan.

  3. 1997

    Yamanashi Maglev Test Line

    Testing moves to Yamanashi. The line is later extended to about 42.8 km and becomes part of the future route.

  4. 2014

    Construction approved

    Work on the Chuo Shinkansen starts. Public rides at 500 km/h are offered on the test line by lottery.

  5. 2015

    603 km/h

    An L0 series train sets the world speed record for rail vehicles.

  6. 2017

    Dispute in Shizuoka

    Shizuoka Prefecture blocks tunneling over concerns about the Oi River, which supplies water to about 620,000 people.

  7. 2024

    2027 opening abandoned

    JR Central says the original target date can no longer be met.

  8. 2025

    Cost rises to 11 trillion yen

    The estimate for the Tokyo to Nagoya section roughly doubles compared with the original plan.

  9. 2026

    Shizuoka gives the green light

    In January JR Central agrees to compensate any loss of river flow. In March the prefecture's expert panel approves all environmental measures, and on 7 July Governor Yasutomo Suzuki approves construction of the 8.9 km Shizuoka section.

Status

Where the project stands in 2026

Construction is under way along the whole route, and work in Shizuoka can now begin. JR Central expects the section through the Southern Alps, with tunnels up to about 1,400 meters below the surface, to take at least a decade. That puts the opening between Tokyo and Nagoya in 2036 at the earliest. No date has been set for the extension to Osaka.

Fares have not been fixed. JR Central's planning assumption is a supplement of about 700 yen over today's Nozomi fare.

Assessment

Strengths and challenges

StrengthsThe only long-distance high-speed maglev with a funded line under construction. Large safety margins thanks to the 10 cm gap. Decades of daily test operation in Yamanashi.
ChallengesThe Oi River dispute delayed the project by years. Costs have roughly doubled, tunneling through the Southern Alps is difficult, and analysts expect the line to weigh on JR Central's profits after opening.
Abroad

SCMaglev outside Japan

JR Central has promoted the system abroad, most prominently for a line between Washington, Baltimore and eventually New York. In July 2025 the US Federal Railroad Administration ended the environmental review of the Baltimore to Washington project. More in our projects archive.

Join the team

Help build maglevhub.com

maglevhub.com started in 2026 as the international offshoot of magnetbahn.de and is now growing on its own. We are looking for writers, translators, researchers, video makers and developers from all over the world.